中文  |  ENGLISH
National high-tech enterprises
Advanced electric heating service providers
Leaders in the field of energy saving and heating
Core enterprise of "electricity replacing coal"
More than 100 projects won the bid annually
Comply with the clean heating policy
Good quality reputation
More than ten national patents
China compulsory CCC product certification
ISO9001 international product certification
Professional team professional construction
The whole process of service
Service network, wide area coverage
Electric heating enters the rural area to bid farewell to the era of coal-fired;
Electric heating into the city efficient heating intelligent and convenient;
Join hands to start a business
Share a good life
Civil service
Current page: Home> Service> Civil service
Civil service | Villa heating scheme

【 technical scheme 】

Ground source heat pump (GSHP) is a system integrating refrigeration, heating (water and floor heating) and domestic hot water, which mainly includes outdoor ground energy exchange system, ground source heat pump unit and indoor heating and air conditioning terminal system.

[heating advantages]

High efficiency and energy saving

One machine is used three times to make full use of the ground energy. Usually, the ground source heat pump consumes 1KW of energy, and the user can get more than 5KW of heat or more than 4KW of cooling, which can save 40-50% of energy compared with the traditional central air conditioner.

Green environmental protection

Underground energy is renewable energy, without heat pollution, noise pollution, and harmful gas emissions, which truly saves energy and reduces emissions.

Stable and reliable

It is not affected by external high temperature or cold, stable operation, no boiler, storage tank and other health and safety risks, the system life can reach 20 years, the buried tube heat exchanger life can reach 50 years.

Control of simple

The whole system is controlled by programmable intelligent remote central computer, which can automatically adjust the cooling or heating output of the ground heat pump with the change of people flow, so as to maximize the energy saving and minimize the operating cost.

Villa winter heating should be based on the actual needs of the family, comprehensive consideration of whether there are elderly children, daily use frequency, comfort and local heating environment and other factors.The best heating for your home is the best.

[equipment selection]

Air source heat pump

Wall warm

Electric heating cable

Solar mesothermal system

[contact information]

For further information, please contact us

If you need more detailed construction plan, you can call our hotline.

Phone: 15653722111

Machine: 0537-2537889

Q Q: 2624479618

E-mail: 2624479618 @qq.com


 

 

Jining Yinuo Thermal energy technology Co.,Ltd. © 2020 YISTE ALL Rights Reserved